Kitchen systems
Exhaust, make-up air, fire suppression, gas, equipment loads, refrigeration, and the paths required to serve them.
Restaurants ask more of a building than almost any other commercial use. We identify the infrastructure, code, equipment, and schedule implications while the concept still has room to move.
Evaluate a locationWe focus first on the physical and operational realities most likely to affect feasibility, capital, or opening.
Exhaust, make-up air, fire suppression, gas, equipment loads, refrigeration, and the paths required to serve them.
Sanitary capacity, grease interception, floor sinks, drains, domestic water, and the cost of routing through an existing building.
Health, fire, building, accessibility, occupancy, and landlord reviews that must align with the construction schedule.
Receiving, storage, prep, service, waste, staff circulation, and guest experience tested against the physical space.
Confirm whether the building can support the intended kitchen and occupancy.
Coordinate equipment, consultants, utilities, permitting, and constructability early.
Keep scope, budget, decisions, and vendor coordination moving toward opening.
A restaurant plan grounded in the building’s actual capacity, with infrastructure risk identified before it becomes redesign or change-order cost.